Categories
HT Local News

Gerald Desmond Bridge replacement at Port of Long Beach nearly complete

By Sid Garcia for ABC7 #los-angeles-ca

LONG BEACH, Calif. (KABC) — After seven years of construction, the Gerald Desmond Bridge replacement at the Port of Long Beach is nearly complete!

The port says the billion-dollar bridge was needed to accommodate the big cargo ships coming into the area.

The new bridge is over 200 feet tall and nearly 9,000 feet long — and has been tested to withstand earthquakes and hurricane force winds.

It’s scheduled to open in mid-October, and there won’t be a toll to cross it.